← Commercial toolkitDESIGN PREVIEW • Prepared for review — customize per property
State Shield Pest Protection
MAKE-READY CHECKLISTUnit turnover

Unit-turnover pest checklist

For maintenance and make-ready teams between residents. Check each item, note anything that needs work, and send pest observations to your pest provider before the next move-in.

PROPERTY
UNIT
MOVE-OUT
MOVE-IN
CHECKED BY

Kitchen 01

  • Plumbing penetrations sealed under the sink
  • Appliance voids checked behind the range, refrigerator, and dishwasher
  • Cabinets and drawers empty and wiped
  • Drain clear; no leaks under the sink

Bathrooms 02

  • Penetrations sealed at vanity and toilet
  • Pipe trim rings (escutcheons) tight to wall
  • Drains clear in tub, shower, and sink
  • No leaks at supply lines, toilet, or tub

Balcony / lanai / patio 03

  • Cleared of left-behind items and boxes
  • Screens and screen doors intact
  • No standing water (drains, plant saucers)

Doors, windows & walls 04

  • Door sweeps intact; no daylight below
  • Weatherstripping intact at entry doors
  • Window and door screens in place, no tears
  • Wall penetrations sealed (A/C, cable, vents)
  • A/C and water heater closets dry and clear

Outside the unit 05

  • Mulch line kept below the slab edge
  • Shrubs and branches not touching the building
  • Exterior penetrations sealed (hose bib, A/C)
  • Trim-backs noted for the landscape crew

Final check 06

  • No food, trash, or cardboard left behind
  • Pest activity seen? Note where below and report it before move-in
NOTES · ITEMS NEEDING WORK · PEST OBSERVATIONS
UNIT STATUSReady for move-inNeeds follow-up before move-in

Report pest activity to
State Shield Pest Protection
239-799-7378